⚠ This page is served via a proxy. Original site: https://github.com
This service does not collect credentials or authentication data.
Skip to content

Conversation

@vimauro
Copy link

@vimauro vimauro commented Jan 16, 2026

Summary

  • Add TNF (Two Node with Fencing) Y-stream upgrade test to the 4.21 → 4.22 upgrade lane
  • Remove allow_skip_on_success from the TNF upgrade workflow to ensure resource cleanup

@openshift-ci-robot
Copy link
Contributor

openshift-ci-robot commented Jan 16, 2026

@vimauro: This pull request references OCPEDGE-1523 which is a valid jira issue.

Warning: The referenced jira issue has an invalid target version for the target branch this PR targets: expected the story to target the "4.22.0" version, but no target version was set.

Details

In response to this:

Summary

  • Add TNF (Two Node with Fencing) Y-stream upgrade test to the 4.21 → 4.22 upgrade lane
  • Remove allow_skip_on_success from the TNF upgrade workflow to ensure resource cleanup

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci-robot openshift-ci-robot added the jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. label Jan 16, 2026
@openshift-ci openshift-ci bot added the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Jan 16, 2026
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Jan 16, 2026

Skipping CI for Draft Pull Request.
If you want CI signal for your change, please convert it to an actual PR.
You can still manually trigger a test run with /test all

@vimauro
Copy link
Author

vimauro commented Jan 16, 2026

/pj-rehearse periodic-ci-openshift-release-master-nightly-4.22-upgrade-from-stable-4.21-e2e-metal-ovn-two-node-fencing-upgrade

@openshift-ci-robot
Copy link
Contributor

@vimauro: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Jan 16, 2026

@vimauro: The following test failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/rehearse/periodic-ci-openshift-release-master-nightly-4.22-upgrade-from-stable-4.21-e2e-metal-ovn-two-node-fencing-upgrade cce9eea link unknown /pj-rehearse periodic-ci-openshift-release-master-nightly-4.22-upgrade-from-stable-4.21-e2e-metal-ovn-two-node-fencing-upgrade

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@vimauro
Copy link
Author

vimauro commented Jan 16, 2026

/pj-rehearse periodic-ci-openshift-release-master-nightly-4.22-upgrade-from-stable-4.21-e2e-metal-ovn-two-node-fencing-upgrade

@openshift-ci-robot
Copy link
Contributor

@vimauro: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci-robot
Copy link
Contributor

@vimauro: job(s): periodic-ci-openshift-release-master-nightly-4.22-upgrade-from-stable-4.21-e2e-metal-ovn-two-node-fencing-upgrade either don't exist or were not found to be affected, and cannot be rehearsed

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Jan 16, 2026

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by: vimauro
Once this PR has been reviewed and has the lgtm label, please assign wking for approval. For more information see the Code Review Process.

The full list of commands accepted by this bot can be found here.

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci-robot
Copy link
Contributor

[REHEARSALNOTIFIER]
@vimauro: the pj-rehearse plugin accommodates running rehearsal tests for the changes in this PR. Expand 'Interacting with pj-rehearse' for usage details. The following rehearsable tests have been affected by this change:

Test name Repo Type Reason
periodic-ci-openshift-release-master-nightly-4.22-upgrade-from-stable-4.21-e2e-metal-ovn-two-node-fencing-upgrade-techpreview N/A periodic Periodic changed
Interacting with pj-rehearse

Comment: /pj-rehearse to run up to 5 rehearsals
Comment: /pj-rehearse skip to opt-out of rehearsals
Comment: /pj-rehearse {test-name}, with each test separated by a space, to run one or more specific rehearsals
Comment: /pj-rehearse more to run up to 10 rehearsals
Comment: /pj-rehearse max to run up to 25 rehearsals
Comment: /pj-rehearse auto-ack to run up to 5 rehearsals, and add the rehearsals-ack label on success
Comment: /pj-rehearse list to get an up-to-date list of affected jobs
Comment: /pj-rehearse abort to abort all active rehearsals
Comment: /pj-rehearse network-access-allowed to allow rehearsals of tests that have the restrict_network_access field set to false. This must be executed by an openshift org member who is not the PR author

Once you are satisfied with the results of the rehearsals, comment: /pj-rehearse ack to unblock merge. When the rehearsals-ack label is present on your PR, merge will no longer be blocked by rehearsals.
If you would like the rehearsals-ack label removed, comment: /pj-rehearse reject to re-block merging.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants